NOEMA / DELIVERY

A defined scope. Evidence you can review.

For manufacturing companies in Switzerland and German-speaking markets: turn a robotics or industrial AI question into a scoped research, engineering or validation project.

The scope, named responsible parties, dates and acceptance criteria are agreed in writing before a project starts. The examples below describe possible deliverables; they are not completed client references.

Technical research plan

CHF 30,000–50,000

Possible deliverables

  • Problem brief, constraints and evaluation criteria
  • Comparison of technical routes with linked sources
  • Candidate capability shortlist and recommendation

Customer inputs

Provide the use case, product variants, available data and the decision your team needs to make.

Review and acceptance

Review whether the alternatives answer the agreed question, assumptions are visible and the recommendation has supporting evidence.

Industrial technology solution

CHF 60,000–120,000+

Possible deliverables

  • System architecture and interface boundaries
  • Validation plan with test conditions and metrics
  • Risk register, implementation work packages and handover requirements

Customer inputs

Provide process descriptions, representative samples, interface information and a responsible operating contact.

Review and acceptance

Review traceability from requirements to architecture and tests. Prototype, test execution and installation are included only when stated in the proposal.

Strategic technology project

CHF 120,000–250,000+

Possible deliverables

  • Technology and use-case roadmap with priorities
  • Research and engineering capability map
  • Staged investment and pilot decisions with evidence gates

Customer inputs

Provide strategic objectives, operating constraints, decision owners and the intended planning horizon.

Review and acceptance

Review priorities, dependencies and decision gates. Funding, partner availability and commercial outcomes are not guaranteed by a roadmap.

Existing indicative project budgets. A binding quotation follows scope confirmation.

Four stages with a clear decision at the end

  1. 01

    Scope

    Agree the question, exclusions, required inputs and decision criteria.

  2. 02

    Plan

    Name responsible parties and agree milestones, budget and review dates.

  3. 03

    Deliver

    Produce the agreed analyses or engineering artefacts and maintain an issue log.

  4. 04

    Review

    Assess evidence against the agreed criteria and document the next decision.

How the schedule is established

First confirm the problem, data access and decision to be made. Then define milestones for analysis, validation and review, including customer dependencies. Dates and any response commitments belong in the written proposal; the website does not promise a fixed turnaround for every project.

Acceptance before expansion

Each phase should end with agreed evidence and a decision: proceed, revise the scope or stop. A feasibility result is distinct from production readiness. Installation, safety validation, certification and ongoing operation are separate work packages unless expressly included.

Responsibility is assigned to people, not a diagram.

Customer decision owner

Confirms objectives, supplies agreed inputs and accepts the output.

NOEMA project lead

Is named in the project scope and coordinates milestones, communication and handover.

Specialist or research partner

Contributes only within a confirmed scope and availability; expertise and responsibilities are agreed for that project.

Illustrative deliverable β€” not a client case

Machine-vision feasibility: example assessment structure

A hypothetical precision-parts manufacturer wants to assess visual inspection for surface defects. No customer, performance result or supplier quotation is implied. Unknowns remain marked as tests to perform.

  1. 01Decision brief

    Determine whether a repeatable imaging and inspection approach can distinguish the agreed defect classes on representative parts. The first decision is whether to fund a bounded pilot, not whether to release production.

  2. 02Scope and exclusions

    Study one agreed product family. Include defect definitions, image acquisition and evaluation design. Exclude automatic line control, equipment installation and production certification unless separately agreed.

  3. 03Inputs and missing evidence

    Request labelled good, defective and borderline samples from independent production lots; record surface variation, traceability and cycle requirements. Defect prevalence and achievable detection performance are unknown until evaluated.

  4. 04Options to compare

    Compare a rule-based baseline with a learned classifier under the same image setup. Evaluate repeatability, false rejects, escaped defects, latency and maintenance effort. No option is scored as successful before a test.

  5. 05Risk register

    Unstable illumination β†’ repeat reference captures; ambiguous labels β†’ quality-team adjudication; duplicated samples β†’ lot-based separation; lost part identity β†’ interface reconciliation test. Assign an owner and evidence requirement to each risk.

  6. 06Acceptance plan

    Agree independent test lots, per-defect metrics, sample size, handling of uncertain cases and allowed interventions before testing. Numerical thresholds are customer-specific and remain to be agreed.

  7. 07Handover and next decision

    Deliver the assessment, assumptions, dataset description, test protocol and open-issue log. Decide whether to proceed, improve the input process or stop. Record dates and named owners in the actual project proposal.